
Before you rent in Richfield
- Apply for the Rental license and inspections. How: Online application through CitizenServe portal. Start here.
- Pass the rental inspection. Inspected by: city inspector (Inspections Division). How often: Every year (interior, exterior and common areas)
- Renew on time. Cycle: annual. Due: December 31
- Program
- Rental license and inspections
- Main fee
- 3rd inspection $50; 4th $100; 5th $200; 6th and more $400 each, up to a maximum of $1,500 per inspection
- Other fees
- 1 more in the fee table below
- Renewal
- Annual. December 31
- Inspections
- Every year (interior, exterior and common areas)
- Inspected by
- city inspector (Inspections Division)
- When ownership changes
- New owners must give tenants in affordable units a 3-month protection period and send a notice to tenants within 30 days after a building tr…
Who needs it in Richfield
Owners of all residential rental property in the city.
Fees
| Item | Amount | Applies |
|---|---|---|
| Reinspection, buildings with 1-2 units (Effective January 1, 2023; two inspections included in license fee) | 3rd inspection $50; 4th $100; 5th $200; 6th and more $400 each, up to a maximum of $1,500 | per inspection (source) |
| Reinspection, buildings with 3+ units (Effective January 1, 2023) | 3rd inspection $100; 4th $200; 5th $400; 6th and more $800 each, up to a maximum of $3,000 | per inspection (source) |
Fees as published by the city when we checked on November 21, 2026. Cities usually update fee schedules each year. Plug these into the first-year cost estimator.
Renewal and deadlines
- Cycle: annual
- Due: December 31
Source: Richfield renewal information. Add it to your calendar with the deadline calendar.
Inspections
- How often: Every year (interior, exterior and common areas)
- Who inspects: city inspector (Inspections Division)
- Inspection fee: Two inspections included in license fee
- Reinspection fee: 1-2 units: $50 / $100 / $200 / $400 for 3rd-6th+ (max $1,500); 3+ units: $100 / $200 / $400 / $800 (max $3,000)
Source: city inspection information
What Richfield's own checklist looks for
- Furnaces over 15 years old or installed without permit, and transite chimneys, may need certification by a licensed heating contractor
- Water heater relief valve overflow pipe within 18 inches of floor
- Dryer vent must be metal (no vinyl), not reduced, joined with foil tape and no screws
- Bedroom doors with key locks and double-cylinder locks on exterior doors are prohibited
- First-floor windows need locks
- Backflow preventers on laundry tub and exterior hose faucets
- Non-globed closet light fixtures need 12 inches of clearance from storage
Read the full list on the city's inspection checklist before your appointment.
Separately from any city rule, a home built before 1978 needs the federal lead disclosure before every new lease.
Buying or selling a rental in Richfield
New owners must give tenants in affordable units a 3-month protection period and send a notice to tenants within 30 days after a building transfers ownership (City Code Section 409). (source)
Other requirements
- Occupancy limits by bedroom size: 70 to under 120 sq ft = 1 person; 120 to under 180 sq ft = 2; 180+ sq ft = 3. (source)
- Owners of 1-3 unit buildings are responsible for unpaid organized garbage collection charges even if the account is in the tenant's name; balances of $100+ are assessed to property taxes. (source)
- Use must comply with the zoning code definition of 'family' (Section 507.07, Subd. 45). (source)
What catches first-time landlords in Richfield
- Every rental is inspected every year, and all licenses renew by December 31.
- Reinspection fees double with each visit past the second, capped at $1,500 (1-2 units) or $3,000 (3+ units).
- Buyers of buildings with affordable units must give tenants a 3-month protection period and notify them within 30 days of the sale.
- Landlords of 1-3 unit buildings are on the hook for tenants' unpaid garbage bills.
Who to call
Community Development - Inspections Division
Phone: 612-861-9860
Department website
Not yet confirmed
- Base annual license fee amounts were not found on a city page (fees are set in the City Code appendix on Municode, which blocked automated access).
Sources
Last checked November 21, 2026. This page summarizes the city's rules in plain language and is not legal advice. If anything here differs from the city's code or its licensing office, the city is right. Report an error or a change.