
Before you rent in Coon Rapids
- Apply for the Rental dwelling license. How: Completed application submitted in person at City Hall. Start here.
- Pass the rental inspection. Inspected by: city housing inspector. How often: Initial inspection before licensing; then every 1, 2 or 3 years based on inspection results
- Renew on time. Cycle: annual (same renewal date every year). Due: Renewal packet and fee due 30 days before license expiration (form sent 60 days before)
- Program
- Rental dwelling license
- Main fee
- $85 per occurrence
- Renewal
- Annual (same renewal date every year). Renewal packet and fee due 30 days before license expiration (form sent 60 days before)
- Inspections
- Initial inspection before licensing; then every 1, 2 or 3 years based on inspection results
- Inspected by
- city housing inspector
- When ownership changes
- Licenses are non-transferable; new owners must apply for a new license. Owners must notify the city when they sell.
Who needs it in Coon Rapids
Any dwelling occupied by someone other than the owner of record, even if no rent is paid or the occupant is an employee.
The city lists these exemptions:
- Contract-for-deed sales where the buyer occupies and the contract is on a uniform conveyancing blank or recorded with Anoka County
- Owner or owner's qualifying relative living there with two or fewer tenants sharing all living spaces
- 'Snowbird' owners renting for less than 120 days while living outside Minnesota
Fees
| Item | Amount | Applies |
|---|---|---|
| Re-inspection fee for failing to reschedule an inspection at least 24 hours ahead | $85 | per occurrence (source) |
Fees as published by the city when we checked on November 21, 2026. Cities usually update fee schedules each year. Plug these into the first-year cost estimator.
Renewal and deadlines
- Cycle: annual (same renewal date every year)
- Due: Renewal packet and fee due 30 days before license expiration (form sent 60 days before)
- Late fee: Starting in 2026, late renewals incur a late fee (amount not stated)
Source: Coon Rapids renewal information. Add it to your calendar with the deadline calendar.
Inspections
- How often: Initial inspection before licensing; then every 1, 2 or 3 years based on inspection results
- Who inspects: city housing inspector
- Reinspection fee: $85 for missed/late-cancelled appointment
Source: city inspection information
What Coon Rapids's own checklist looks for
- CO alarms within 10 feet of all sleeping rooms; smoke alarms per original construction date
- Handrails with 4 or more risers; guardrails over 30 inches
- No extension cords, splitters or unapproved strip outlets as permanent wiring; panel accessible and labeled
- Bathrooms need an operable window or exhaust fan vented outside
- Grass under 8 inches; vehicles operable, tabbed, on approved surfaces
- Storage: 2 feet below ceiling, 3 feet in front of doors, windows and baseboard heaters; garage must fit a vehicle
Read the full list on the city's inspection checklist before your appointment.
Separately from any city rule, a home built before 1978 needs the federal lead disclosure before every new lease.
If you rent without it
- Administrative citations are issued for uncorrected violations; corrections are due within 30 days of inspection. (source)
Buying or selling a rental in Coon Rapids
Licenses are non-transferable; new owners must apply for a new license. Owners must notify the city when they sell. (source)
Other requirements
- Background check form and government ID copy for each owner; the city allows two weeks for processing. (source)
- Proof of Crime Free Multi-Housing course completion, Coon Rapids Rental Property Training Program registration, or R-HOME training. (source)
- A local agent is required if the owner lives outside the Twin Cities metropolitan area; the tenant cannot be the agent. (source)
- Water and sewer bills must remain the owner's responsibility. (source)
- Plumbing, electrical, mechanical and gas work on rentals must be done by licensed contractors. (source)
- Short-term rentals (Airbnb, Vrbo) are prohibited (City Code 12-904). (source)
What catches first-time landlords in Coon Rapids
- Applications must be filed in person, and licensing takes about 4-6 weeks including a background check.
- Snowbirds renting their home under 120 days while out of state are exempt.
- Owners cannot do their own plumbing, electrical, mechanical or gas work on a rental.
- Short-term rentals are banned citywide.
- Late renewal fees begin in 2026.
Who to call
Housing Inspector, Community Development
Phone: 763-767-6575
Department website
Not yet confirmed
- Annual license fee amounts were not found (the rental brochure PDF failed to download).
Sources
- Coon Rapids Rental Properties
- Rental Licensing FAQs and Basic Responsibilities
- Rental Inspection Checklist
Last checked November 21, 2026. This page summarizes the city's rules in plain language and is not legal advice. If anything here differs from the city's code or its licensing office, the city is right. Report an error or a change.